— 364 —
measures on the part of the Turkish Government, the shipping traffic, which chiefly comes into account for the trade of this place, suffered no essential check, and, encouraged by the earnest continuation of the building of the railway Haifa–Damascus–Mecca, a brisk activity developed in trade and industry. This railway, which constitutes Haifa's future, was opened in May of last year as far as the Jordan bridge (Jisr el-Mujâmi, 77 km). Its length up to the point lying 2 km south of Mzerib, where it joins the connecting section Mzerib–Der'ât, amounts to 149 km, so that the whole line Haifa–Der'ât will be 160 km long. The railway runs first from here in a south-easterly direction through the plain of Jezreel (Merj ibn 'Amir) to Bêsân (59 km), then turns down into the Jordan valley and follows the Jordan upstream to the southern end of the Lake of Tiberias (Lake of Gennesaret), which, after the crossing of the Jordan on the bridge (Jisr el-Mujâmi, 77 km), has meanwhile been reached at the village of Samach (83 km).¹) From there the line proceeds to the hot springs of el Hammi (87 km) at the mouth of the Yarmuk valley, and then climbs in many windings up the valley to the high plateau of the Haurân, which is reached at Tell esh-Shihab. In the building of this trans-Jordanic section (Jordan–Der'ât) many technical difficulties have to be overcome. In the narrow valley of the Yarmuk the river is crossed twelve times by the railway, and the construction requires a considerable number of iron bridges, crossings, and tunnels, so that the short section from km 93 to km 149 alone came to stand at 300,000 Turkish pounds. The alignment and gradient conditions of the French railway Beirût–Damascus in the Lebanon have taught that a routing with gradients of up to 76 per metre and with rack-rail sections scattered over the whole length is a mistaken undertaking, because the trains can carry only small loads (in the case in question up to 50 tons) and the costs thereby become too high. The management of the Hejaz railway construction has therefore endeavoured to reduce the gradients as far as possible despite the difficult terrain; at no point has a gradient of 20 per metre been exceeded.
Between here and Jisr el-Mujâmi, and in the reverse direction, a passenger train runs three times a week, while daily three trains travel over this section, which, however, are for the present used chiefly for the despatch of railway materials.
The rolling stock has grown in the year under report to 6 locomotives, 28 open and 34 closed goods wagons, 2 passenger carriages of the II. class, and 6 passenger carriages of the III. class. A further 4 passenger carriages of the I. class and 25 goods wagons are expected shortly.
In consequence of the failure of the harvest, the traffic receipts are as yet confined exclusively to the conveyance of passengers, and yielded from March 1904 to March 1905: 360,000 piasters Government money. It is hoped by August 1905 to effect the junction with the main line and to be able to hand over to traffic the 469 km long section Haifa–Maân.²) It may then be assumed with certainty that the corn grown in the plain of Jezreel, in the Jordan valley, and in the Haurân mountains will be conveyed throughout by rail to Haifa, and that the railway, with its low tariff rates, can compete very well with the camel transport customary hitherto.
¹) Consul Keller's report was rendered in July 1905. From our later communications readers will have learned that the Haifa section has already reached the Hejaz railway. The Editors.
²) This has meanwhile taken place. The Editors.
