Altneuland · Vol. I, No. 11 · November 1904
349printed page
scan 33 of 36
Facsimile · scan 33 of 36
Scan of p. 349
English · AI translation, checked against the German

— 349 —

ties are to be overcome; the works here began in December 1903. In the narrow valley of the Yarmuk the river is crossed twelve times by the railway, and the railway building requires a considerable number of iron bridges, viaducts, and tunnels. The alignment and gradient conditions of the French railway Beirut—Damascus in the Lebanon have taught that a location of the line with gradients up to 76‰, and with rack-rail stretches scattered over the whole length, is a mistaken undertaking, because the trains can transport only small loads (in the present case up to 50 tons) and the charges thereby become too high. Hence the Hedjaz railway construction management has striven to reduce the gradients to a minimum despite the difficult country; at no place has a gradient of 20‰ been exceeded.

Since the end of October 1903 goods and persons have been carried on the railway, provisionally from Haifa to Besân and in the reverse direction. But the public traffic is for the present still very limited, since the trains are used predominantly for the transport of railway building materials. Up to the end of the year 1903 only 1703 tons of actual traffic goods were carried, namely 1503 tons, almost entirely grain, from the interior to Haifa, and only 190 tons from Haifa to the interior. Of passengers, 1720 were carried in the same period. It may be assumed with certainty that the grain grown in the plain of Jezreel and in the Jordan valley will be conveyed throughout by the railway to Haifa, and that the latter, with its low tariff rates, can compete very well with the camel transport hitherto customary. The goods traffic from the coast into the interior, however, will remain insignificant for a long time, and this will be of advantage to the progress of the Hedjaz railway building, inasmuch as an essential purpose of the Haifa railway is the carriage of building materials for the railway line Damascus—Mecca.

As regards the opening-up of the trans-Jordanic districts hoped for from the main line of the Hedjaz railway, a general remark may here be permitted.

The current view, leaning upon the geographical designations Arabia Petraea and Arabia Deserta, regards the whole land east of the Suez Canal, and with it the regions stretching farther northward east of the Dead Sea and Jordan, as unproductive soil. In reality, however, this country traversed by the Hedjaz railway is, at least as far as Ma'ân — that is, as far as the railway has been built — not only not sterile, but an excellent arable soil. This makes explicable the fact that these regions, up into northern Syria, which at present number perhaps 2½ million inhabitants, held 22 millions of them at the beginning of the Christian era and were counted among the granaries of the Roman Empire. Numerous remains of considerable Roman settlements still today bear witness to the former importance of the regions traversed by the Hedjaz railway. With so diminished a population, however, the country cannot at present be exploited as it must formerly have been. Entirely sufficient quantities of rain fall in these regions, but these are for the greatest part lost, because, precisely for want of a sufficient population, no care can be taken for the collection of the waters, and the former cisterns have fallen into decay; in a number of cases, however, their restoration is not difficult. Thus near Dschise, km 260, there is a Roman walled rectangular water reservoir of 70,000 cbm capacity, which is now being