Altneuland · Vol. I, No. 11 · November 1904
347printed page
scan 31 of 36
Facsimile · scan 31 of 36
Scan of p. 347
English · AI translation, checked against the German

— 347 —

The building of this railway, serving chiefly the purposes of the Mohammedan pilgrimage to Mecca, was begun in the spring of 1901 and has since made good progress. It is being carried out by the Turkish Government under its own management, under the chief direction of a German engineer.

a) The main line Damascus—Mecca. The earthworks had by May 1904 advanced to km 500, that is, to 40 km south of Ma'ân; the track-laying was completed to km 360, and is to be finished as far as Ma'ân (km 460) by the 1st of September 1904 (the festival of the Sultan's accession to the throne). The railway line begins at the station of Kadem, situated 1 km before the south gate (Bauwabet Allah) of Damascus, turns first toward the SE., then toward the SW., reaches at km 21, not far from the Kiswe station of the French Hauran railway, the station of Kiswe, then turns again to the SE. and reaches at km 50 the station of Mismije, situated on the edge of the lava region of el-Ledscha; from here it draws along the edge of the Ledscha to Esra' (km 91), and then in a southerly direction through the Hauran plain proper to Der'ât (km 123), where the offices of the construction management and the repair workshops are at present situated. The station of Der'ât is placed in connection with M'zerib, the terminus of the French Hauran railway (Damascus—M'zerib), by a connecting line 13½ km long, so that the whole net of the main line Damascus—Ma'ân has a length of 460 + 13 = 473 km. The names of the stations of this line and their distances from Damascus are the following:

Station nameDistance from Damascus*) in kmStation nameDistance from Damascus*) in km
Kadem . . . . . . . .0.00Chirbet es-Samra . . . .185.30
Kiswe . . . . . . . .20.80Zerka . . . . . . . .202.75
Dêr Ali . . . . . . . .30.50Ammân . . . . . . . .222.40
Mismije . . . . . . . .49.70Kasr . . . . . . . . .234.05
Dschibab . . . . . . .62.60Lubban . . . . . . . .248.50
Chabab . . . . . . . .69.10el-Dschize (Kal'at Ziza) . .259.70
Mahaddscha . . . . . .77.80Dabba'a . . . . . . .279.15
Schakra . . . . . . .84.60Chan es-Zebib . . . . .295.70
Esra' . . . . . . . .91.25el-Katrane . . . . . . .326.60
Chirbet el-Ghazâle . . . .106.10Kal'at el Hassa . . . . .378.25
Der'ât (Deraâ) . . . . .123.00Wadi Berma . . . . . .397.80
Nassib . . . . . . . .135.75Kal'at Aneze . . . . . .423.25
Mafrak . . . . . . . .161.70Ma'ân . . . . . . .460.00

The railway line has on the stretch Damascus—Ma'ân 65 larger bridges (1 iron one of 15 m span and 64 of stone), 1 viaduct of 10 arches, 60 m in length and 20 m in height, and 1 tunnel of 140 m in length (the two last-mentioned engineering works lie between the stations of Ammân and Kasr at km 232 and 233). Considerable earthworks had to be carried out between km 185 and 315 and between km 374 and 379. From Ma'ân the railway is to be carried further in a south-south-easterly direction, following in general the pilgrim road, by way of Kal'at el-Mudawwara, Tebuk, Kal'at el-Achdar, el-Muazzam, Dâr el-hamra, Medâin-Sâlih, Kal'at el-Sumrud, and Hedija to Medina. The stretch Damascus—Ma'ân represents approximately one third of the way to Medina. The length

*) The kilometres are counted from the station of el-Kadem.