The Maccabaean · Vol. XXXIII, No. 2 · February 1920
69printed page
scan 27 of 36

The Maccabaean

ning, actual reconstruction work in Jerusalem and elsewhere in Eretz-Yisroel is energetically carried on to prepare the town and the land for the high tide of immigration now rising at their gate. The general press of America abounds with "feature" articles telling of an astonishing volume of international good will and interest poured out upon the nascent Hebrew University at Jerusalem. While the University is flourishing in the prospect of co-operation on the part of a sheer endless number of celebrated international teachers, the town around it is made livable once more, after many centuries of desolation, by busy hands and brains, as witness the following newspaper account:

NOTABLE IMPROVEMENTS IN JERUSALEM

The important work of furnishing the Jewish district of Jerusalem, the northwestern part of the Holy City, with a much-needed drainage system is now in progress, and it is expected will be finished about the middle of next March. It has been arranged by the Zionist Commission, but it is noteworthy that the contract is made out in the name of the British Government. Actually, the parties signing the document are Colonel G. Gray Donald, for the Chief Administrator, Occupied Enemy Territory Administration, South, who is termed "the principal representing the Zionist Commission," and Messrs. Bondi, the contractors. The work was to start by September 13th and to be completed within six months of that date.

There are interesting points in the document which says "Palestine" should become of historic value as dating one of the first pieces of modern constructive work in the regeneration of Jerusalem.

The sewers to be constructed are thus set out: 12 in., 400 metres; 9 in., 200 metres; 6 in., 3,500 metres; and 107 manholes, together with combined manholes and flush-tanks and the necessary subdrains. A bond is to be furnished by the contractor, approximately in the sum of ten per cent of the contract price. The work was to be begun within three weeks after the award of the contract; no sub-contracts are to be given out to parties unacceptable to the Administration, and a penalty of £10 per day is to be inflicted on the contractor should he fail to complete the work in the stipulated time. It is also laid down that in the event of the progress being deemed unsatisfactory, the Administration may take over the work and complete it at the contractor's expense, after giving ten days' notice. For the safeguarding of the contractor it is also laid down that in the event of "unduly prolonged delays in the delivery of any materials or the performance of work on the part of the Administration, the contractor shall be entitled to corresponding extension of time."

Provision is to be made for free traffic in the streets, which are to be obstructed as little as possible and not to be closed entirely at any time to the passage of teams and pedestrians. Temporary crossings are to be created, and all precautions are to be taken by fencing. Leeping lanterns alight at night, etc., to prevent accidents. All materials and workmanship are to be of the highest standard strictly detailed, and—a most interesting stipulation—"all labor to be employed to be satisfactory to the Zionist Commission. The wage scale of Jewish workmen shall be the basis of payment."

Two per cent of the total cost may be reserved by the Administration for a year after the completion of the work to make good defects developed within this period. On his part, the contractor guarantees the workmanship and materials for one year. On completion of each part of the work, all rubbish and unsightly materials must be removed and streets and grounds left in neat condition. Only Portland cement is to be used, and this is to be subject to close inspection, and it is also directed that "all mortar shall be mixed fresh as used, and any mortar which has begun to set shall be thrown away and not used." Strict rules are set out for the mixing of concrete by hand or machine and as to the method of work generally, one important point being "the work shall be protected from the sun. . . ."—J. C. B.

The economic conditions of the Jewish dwellers within Eretz-Yisroel, according to No. 19 of the British Zionist Bulletin, are taking a decided and gratifying turn toward betterment. According to the Bulletin:

The first payment of compensation for war damages in Palestine has just been made by the British authorities to the inhabitants of Givat Saul, a little colony situated just outside Jerusalem, on the northwestern side of the city, and consisting of about twenty houses, mostly occupied by Yemenites. The damage suffered was due to both the Turkish and the British armies, which, being alike short of such materials as wood and iron, stripped the houses of all articles, from doors and window frames to corrugated iron roofs, which could satisfy these requirements.

In order to adjust the payment of compensation for war damages, the British authorities have established a Central Claims Bureau. The colonists of Givat Saul, in common with other claimants, submitted their claims, and Dr. D. de Sola Pool, of the Zionist Commission, investigated the cases and secured their proper presentation to the authorities. This was not a simple matter, in view of the uncertainty as to whom to ascribe certain damages and difficulties in identifying the owners and their titles to the properties. An amusing instance of the latter was furnished when a large family called "Darbah" was credited with sums due to individuals who had added after their names the Hebrew words "dar bah" (lives there) on a list indicating their residences!

Though the assessments were made over a year ago, the negotiations for the payments of these claims began only about five months ago, and have only now been concluded. The British authorities decided to pay full compensation for those losses caused by their own troops which come under the heading of "preventable damage," consideration of other losses caused by accidents of war being postponed for the present, as are also those caused by the Turkish troops. Naturally the increase in the cost of living in Palestine has reduced somewhat the value of the compensation paid, which is on the basis of prices ruling during the war. The compensation paid to Givat Saul colonists amounts to £1,446, and the respective sums have been paid to the claimants by the Jerusalem Military Governor on the presentation of a letter of confirmation from the Zionist Commission. The colonists have begun the repair of their houses, and soon Givat Saul should resume its normal life. The settlement of these war claims may be regarded as one of the first acts of reconstruction in Palestine after the war.

The most suggestive piece of news, however, that emanates from the Holy City opens a vista of widely ramified Palestinian activities centering at Zionist headquarters in Jerusalem and branching out all over the land, as witness the following:

THE ZIONIST COMMISSION

The Zionist Commission has moved to new premises, Hotel "Yuz." The building is extensive, and is situated in the center of the city, opposite the Post Office in Jaffa Street. This change has made possible the amalgamation of the Zionist, Palestine Office and the Zionist Commission, and the centralization of various departments. The Hotel "Yuz" contains the following departments:

Political.Financial Sub-Committee.Office of the General Secretary.Press Bureau.Management of Local Relief.Accountants.Education.Emigration.Hebrew University.Management Central Relief.

The Commercial and Colonization Department will also be removed from Jaffa, but the Department of Public Works will remain there for the present. The Technical Department is still in the old offices, The rooms in the Hotel “Yuz” being too small for its accommodation. Mr. Ettinger’s exhibition and the Botanical Department also remains in the old ofüces.