We have accordingly for the whole height of the weir: x = (1 + 1.8) — 0.22 x = 2.8 — 0.22 = 2.58 m.

The total height of the weir is thus 2.58 m, and the weir projects 2.58 — 1 = 1.58 m above the original water level.

[Figure: plan sketch showing the Lake of Gennesaret and the Jordan, with the five main ditches marked I, II, III, IV, V branching from the outlet bay, and a dimension arrow ←10 m→]

With these 5000 litres of water per second, according to the earlier data, about 5000 ha could be irrigated.

If the breadth of the diversion canal is denoted by b, and if we assume a ditch depth of 1.2 m, reckoned from the terrain, then after the damming the water will stand in this canal exactly 1 m deep. We then have Q = F · c or 5 cbm = b · 1 · 0.5, whereby c = 0.5 m/sec. is assumed; therefore b = 5/(1 · 0.5) = 10 m.

The breadth of the canal would thus be, directly at the river Jordan, 10 m, with a depth of 1.2 m. This breadth one would execute as a short bay, as the above sketch shows, and from it then let five main ditches branch off, of which each would have to carry 1 cbm/sec.

If we denote the quantity of water which one of these five main ditches carries by Q₁, then likewise Q₁ = F₁ · c₁.

If we choose the water depth equal to half the breadth of the ditch, in order to have the smallest wetted perimeter, then F₁ = b₁²/2.

[Figure: cross-section sketch of a main ditch, with labels: b₁/2 — F₁ — b₁]