— 351 —
Commission, sitting in the Yildiz, but is in reality represented by his favourite Izzet Pasha.
The technical soul of the whole is the German chief engineer Meissner, who performed distinguished work in the Anatolian and Macedonian railway constructions. The railway (narrow gauge) leads from the South Station in Damascus as a parallel line to the already existing French railway to Deraa, where the bureaus of the construction management are situated. The main line is here connected by a branch line with Mezerib, whence a secondary line to Haifa establishes the connection with the sea. From Deraa the railway enters the desert region, where the greatest difficulties were, and will still be, to be overcome. By way of Kalaat Zerka (Blue Castle) the line goes at present as far as Katrane. Thus far the trains are already running — 372 km from Damascus. The costs of the Mecca railway are raised in the first instance by voluntary donations of the Moslems of the whole earth. Up to now about 27 million Kronen have come in.
Baghdad Railway. The building of the first section of the Baghdad railway, 200 km long (Konia—Eregli—Burgurlu), is finished — three quarters of a year earlier, therefore, than could contractually be demanded by the Turkish Government. The opening took place with great solemnity, in the presence of delegates of the Turkish Government as well as of the president of the company, Director Gwinner, of the Deutsche Bank.
The rolling stock comes from German and French factories; the whole permanent-way material has been obtained from Germany.
Herewith the Karaman plain, which this year rejoiced in an uncommonly good harvest, as well as the wide plain of Eregli, which from of old has been provided with a comprehensive net of irrigation channels and is especially fruitful, is joined to the Anatolian railway.
In Konia the Anatolian Railway Company will now erect a branch establishment of its considerable central workshops of Eskichehir; there also stands there already a simple but trim hotel near the station, which is managed under the control of the company. The German Government intends to establish a salaried consulate there as well.
The 50 million Frcs. of 4% obligations of the Turkish loan, which were offered for subscription on the 14th of October in Berlin, Hamburg, Frankfort, and other provincial places by the consortium standing under the leadership of the Deutsche Bank, were at once subscribed five times over. The subscription price was 86.40%, plus 4% accrued interest from the 1st of September to the day of taking delivery. The obligations are drawn up in the French, Turkish, German, and English languages; the payment of the coupons takes place in Berlin, Frankfort, Paris, London, and Amsterdam; the redemption is fixed at 98 years at the longest.
The loan serves, as is well known, for the securing of the Baghdad Railway Company, to which 269,110 Frcs. of it are transferred for every kilometre built, the interest on which, with the amortization quota reckoned in, yields 11,000 Frcs. annually — that is, the sum of the gross receipts per kilometre guaranteed to the railway by the Turkish Government. The 4500 Frcs. per kilometre guaranteed in addition for working costs are secured by the first receipts of the railway, and further by various tithe surpluses. The holders of the loan have a special security in the irrevocable transfer of certain tithes of the provinces of Aidin, Baghdad, Mossul, Diarbekir, Urfa, and Aleppo to the amount of 160,000 Turkish pounds = 2,411,500 Frcs. These tithes are collected directly by the Dette publique and paid over to the Deutsche Bank for the service of the loan.