Ready money was throughout the whole year more strongly demanded than offered, and therefore dear. Agriculturists had to pay on the average 12% interest in order to procure the means for the tillage of their lands; at 9–12% money was lent on produce of the soil, and in the goods trade the rate of interest fluctuated between 6 and 12%. The legal rate of interest is 9%.


Recent News of the Railway Construction in Palestine.

The Haifa–Damascus Railway. In supplement to our communications on the progress of the railway construction on the line Haifa–Damascus in No. 7, pp. 218–219, we take from the "Welt-Korr." the following further particulars: The Haifa–Damascus railway, which the English had begun to build, but which then, through the fault of the English contractors, passed into the hands of the Turkish Government, is now so far completed that for the present, on three days in the week, passenger trains run as far as the Jordan bridge. The passenger carriages come, according to the inscription on the waggons, from the Gotha waggon works Fritz Rothmann & Glück, Aktiengesellschaft, Gotha. The engineers who direct the construction are almost without exception Germans. The locomotives also come from Germany. Various goods waggons, however, and likewise rails and iron sleepers, are of Belgian manufacture; from America too there lately came a steamer-load of rails and iron sleepers. The station buildings are not yet everywhere finished, yet they are at least erected in the rough, and their completion is being diligently worked at. The bridge over the Jordan is also finished, and trains bringing up building material have already for some time been crossing it. It appears strange to the observer that the bridge piers all stand the wrong way round, with the point downstream following the run of the water, while the broader, rounded side faces against the current. Since the bridge was built by a German engineer from Stuttgart, this inverted arrangement cannot be accounted for, and, even if it has little practical importance, it throws an unfavourable light on the German performance. Beyond the Jordan the line follows the course of the Yarmuk, in order gradually to climb the height of the Jolan. But not only natural difficulties of terrain, but also heat and severe fevers set themselves against the railway construction — which is natural, since healthy, good drinking water is lacking, and el-Hammi on the Yarmuk lies 176 metres, and the confluence of the er-Rukkad still 67 metres, below the level of the Mediterranean Sea. Nevertheless it is hoped to establish the connection with el-Muzerib, and therewith with Damascus, this very year.

The Hejaz Railway. A telegram from Constantinople of 17 August reports: On 31 August, the day of the Sultan's accession to the throne, the first part of the Hejaz Railway, 425 km, and of the stretch proceeding from Haifa, 150 km, is to be opened. A special deputation of 20 dignitaries will depart tomorrow, under the leadership of Turkhan Pasha, by special steamer, in order to attend the celebration.